The Comparative Study of the Results of Thermal Acceptance Tests of the Steam Turbine K-325-23.5 with Guarantee Values
DOI:
https://doi.org/10.20998/2078-774X.2016.08.10Анотація
The reconstruction of the unit № 1 in power plant included the installation the new steam condensing turbineK-325-23,5 with output power 325 MW. There was a need of conducting thermal acceptance tests of the turbine. The test was conducted by join stock company ²LvivORGRES². Now, we can compare the test results with the guarantee values. But first, we need to correct of the test results to specified guarantee conditions. The correction is effected by complete recalculation of the turbine and its thermal cycle by a computer program with the consideration of the characteristics of the turbine and plant components and the operating conditions during the test. This method yields a complete correction directly, without the use of individual correction factors and also takes into account to a large extent the interdependence of different variables. The comparison of corrected test results, such as power output, thermodynamic efficiency and heat rate, shows that the reconstruction of the unit № 1 was conducted successfully.
Посилання
DTEK (2014), "Integrirovannyj otchjot DTJeK 2014 [IntegratedreportDTEK2014]",availableat:http://www.dtek.com/uk/investor-relations/annual-reports/2014 (Accessed10December 2015).
(1986), MU 34-70-093-84. Metodicheskie ukazanija po teplovym ispytanijam parovyh turbin [MY 34-70-093-84. Guidelinesforthermal tests of steam turbines], PO "Souztehtnergo", Moscow, Russia.
(1976), Tipovaja jenergeticheskaja harakteristika turboagregata K-300-240 HTGZ vtoroj modifikacii [Typicalpowercharacteristic of turbine K-300-240 HTGZ second modification], ORGRES Moscow, Russia.
DTEK (2012), "Jenergija v dejstvii. Godovoj otchjot DTJeK 2012 [Energy in action. Annual report 2012]", availableat:http://www.dtek.com/uk/investor-relations/annual-reports/2012 (Accessed 10 December 2015).